You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This is to ask a production for the line 6166 with a 1/cos(zd) spacinng and cos(zd)=0.04 (see attached figure and text file for the zenith, azimuth values) both for the training and the test MC.
Given that the priority are LZA data, it would be better that the production starts with the points at zenith> 60 deg, both for training and test data
This is to ask a production for the line 6166 with a 1/cos(zd) spacinng and cos(zd)=0.04 (see attached figure and text file for the zenith, azimuth values) both for the training and the test MC.
Given that the priority are LZA data, it would be better that the production starts with the points at zenith> 60 deg, both for training and test data
dec_6166_zenith_azimuth_grid_step_cos_zd_eq_0.04.txt
The text was updated successfully, but these errors were encountered: