Skip to content

chore(deps): update dependency vite to v6 #45843

chore(deps): update dependency vite to v6

chore(deps): update dependency vite to v6 #45843

Triggered via pull request February 19, 2025 13:00
Status Failure
Total duration 23m 28s
Artifacts 2

continuous-integration.yml

on: pull_request
api-check-needed
7s
api-check-needed
Tests: Print
50s
Tests: Print
Tests: PDF
26s
Tests: PDF
e2e-check-needed
6s
e2e-check-needed
frontend-check-needed
7s
frontend-check-needed
Lint: ClientPrint (ESLint)
18s
Lint: ClientPrint (ESLint)
Lint: Print (ESLint)
30s
Lint: Print (ESLint)
Tests: API
0s
Tests: API
Lint: API (php-cs-fixer)
0s
Lint: API (php-cs-fixer)
Tests: End-to-end build  /  Tests: End-to-end (build job)
28s
Tests: End-to-end build / Tests: End-to-end (build job)
Lint: e2e (ESLint)
21s
Lint: e2e (ESLint)
Tests: Frontend
30s
Tests: Frontend
Lint: Frontend (ESLint)
36s
Lint: Frontend (ESLint)
Matrix: Tests: End-to-end run / Tests: End-to-end
Finish coveralls report
0s
Finish coveralls report
workflow-success
3s
workflow-success
Send out CI success event
0s
Send out CI success event
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 16 warnings
Tests: Frontend
Process completed with exit code 1.
Tests: End-to-end run / Tests: End-to-end (firefox)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (firefox)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (edge)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (edge)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (chrome)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end run / Tests: End-to-end (chrome)
The operation was canceled.
workflow-success
Job frontend-tests failed with status failure
workflow-success
Job e2e-tests-run failed with status failure
Tests: PDF
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Lint: Print (ESLint)
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Tests: Print
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Lint: Frontend (ESLint): frontend/src/components/activity/content/layout/ContentNodeCard.vue#L157
Need to pass argument to the `::v-deep` pseudo-element
Tests: End-to-end run / Tests: End-to-end (firefox)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
e2e-tests-images
228 MB
ecamp~ecamp3~IUEWHP.dockerbuild
68.9 KB