Skip to content

Celery 5 master fix

Celery 5 master fix #4

Triggered via pull request July 10, 2024 11:53
Status Failure
Total duration 1m 2s
Artifacts

build-and-test-py3.yml

on: pull_request
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
Test (3.11)
Process completed with exit code 4.
Test (3.12)
The job was canceled because "_3_11" failed.
Test (3.12)
The operation was canceled.
Test (3.9)
The job was canceled because "_3_11" failed.
Test (3.9)
The operation was canceled.
Test (3.11)
The following actions uses node12 which is deprecated and will be forced to run on node16: actions/checkout@v2. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
Test (3.11)
The following actions uses Node.js version which is deprecated and will be forced to run on node20: actions/checkout@v2. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/